My From Start to Finish 6.0L Build

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

OP
OP
RAMurphy

RAMurphy

Bob
Supporting Member
Military
Joined
Oct 5, 2011
Posts
1,450
Reaction score
4,646
Location
S. Maryland
Leveled the floor in the bathroom, bar area and in front of the door for tile:
P2160004.JPG
P2160003.JPG
P2180011.JPG
P2180009.JPG
 
OP
OP
RAMurphy

RAMurphy

Bob
Supporting Member
Military
Joined
Oct 5, 2011
Posts
1,450
Reaction score
4,646
Location
S. Maryland
My wife finally picked out the color she wanted so this week will be spent painting, installing baseboards, bathroom fixtures, bar components/fixtures. Carpet installation moved up (they had an opening on Saturday, so I have my work cut out for me - but it's doable.
 

Miami-Dade

Staff member
Super Moderator
Supporting Member
Joined
Dec 8, 2016
Posts
3,973
Reaction score
5,100
My wife finally picked out the color she wanted so this week will be spent painting, installing baseboards, bathroom fixtures, bar components/fixtures. Carpet installation moved up (they had an opening on Saturday, so I have my work cut out for me - but it's doable.
Excellent work Bob!! Your a one man army!
 
OP
OP
RAMurphy

RAMurphy

Bob
Supporting Member
Military
Joined
Oct 5, 2011
Posts
1,450
Reaction score
4,646
Location
S. Maryland
Hope everyone had a great Memorial Day weekend and took some quiet time to reflect:

“This is the day we pay homage to all those who didn’t come home. This is not Veterans Day, it’s not a celebration, it is a day of solemn contemplation over the cost of freedom"

And to spend this special day with those close to you. I know I did - My grandbabies:
IMG_2165.jpg
 
OP
OP
RAMurphy

RAMurphy

Bob
Supporting Member
Military
Joined
Oct 5, 2011
Posts
1,450
Reaction score
4,646
Location
S. Maryland
Excellent work Bob!! Your a one man army!
@Miami-Dade Thank you, I appreciate the kind words. I did have some help with the putting the drywall up and my son in-laws (great young men) helped with the drywall painting and door installations (7 doors).
 
Last edited:
OP
OP
RAMurphy

RAMurphy

Bob
Supporting Member
Military
Joined
Oct 5, 2011
Posts
1,450
Reaction score
4,646
Location
S. Maryland
Made some good progress these past couple of days. Painting complete. Tomorrow - work on installing toilet, other bathroom components, bar cabinets, counter/sink and refrigerator. Not critical for carpet install but I'm going to try and get it completed. On schedule for carpet installation on Saturday:
P4280001.JPG

P4280002.JPG

P4280003.JPG
P4280005.JPG
 

Forum statistics

Threads
134,794
Posts
1,908,231
Members
100,159
Latest member
pistolpetem9
Top