should have a lot of crap delivered tomorrow if everything shows up thats supposed to. put the front end up in the air after got home from work this evening.
pulled passenger side axle, cleaned up all the grease that was thrown around, to swap with new one arriving tomorrow.
pulled coilovers to drill top mounting hole for limiting straps, its going to be pretty much directly inline with the shock so should work, if i want to try and leave them on all the time i'll need a different length strap but ill see how it goes. flipped the bottom bolt around - going to use a grade 8 rod coupler to mount the bottom of the strap to the same bolt. bolt may bend, may break, dunno - only plan on using them at track. i am drilling a hole through the "shock tower" and also through the top coilover bracket - so there's 1/2"+ of steel for the adjusting clevis to sit on
got the other weld bung for water tank - going to drop it off tomorrow.
and the ict billet bracket/tensioner thing should also come tomorrow so i can slap it on - it had a belt length for it with a 105a alt - i ordered a belt 1/2" longer but can prob find one local if i need to