I'd say 75% or better complete.

Hard to tell much about it. Footers are 36" wide, 12" deep. Pads for the columns are 36" x 36" and 12" deep. A few of the were close together so they made one large pad.

IMG_1447.jpeg


IMG_1448.jpeg


IMG_1450.jpeg


IMG_1451.jpeg


IMG_1452.jpeg


IMG_1453.jpeg


IMG_1454.jpeg
 

89Suburban

Bull in the china shop
Space X Supporting Member
Joined
Jan 10, 2013
Posts
18,032
Reaction score
51,355
Location
SE PA
OP
OP
pwtr02ss

pwtr02ss

Full Access Member
Joined
Apr 1, 2013
Posts
14,173
Reaction score
33,175
Location
Tennessee
Was worn out last night when I made the post.

The concrete footers are the dimensions I listed before (36" x 12"). The dirt portion is dug with a 36" bucket so like 38" x 18"-24" deep. They will come back and remove all of the junk dirt, dress it up, then rock it. IDK if I'll go out there today, but the plans is to finish all the digging, get all of the rebar tied and bulkheads in, then inspected tomorrow. Pour them Monday AM.
 

89Suburban

Bull in the china shop
Space X Supporting Member
Joined
Jan 10, 2013
Posts
18,032
Reaction score
51,355
Location
SE PA
Was worn out last night when I made the post.

The concrete footers are the dimensions I listed before (36" x 12"). The dirt portion is dug with a 36" bucket so like 38" x 18"-24" deep. They will come back and remove all of the junk dirt, dress it up, then rock it. IDK if I'll go out there today, but the plans is to finish all the digging, get all of the rebar tied and bulkheads in, then inspected tomorrow. Pour them Monday AM.
:grd:
 

Forum statistics

Threads
138,039
Posts
1,997,648
Members
102,975
Latest member
jkhuntzinger
Back
Top