2025 Diesel orders opened

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

BGNuke

TYF Newbie
Joined
Apr 30, 2025
Posts
17
Reaction score
2
Finally produced!! Went on the train today. Shows an arrival between 6/27-7/17 but dealer says that will get narrowed down
Great news! That seemed to move quick - this week was your TPW and it’s already shipped!
 

Stbentoak

Full Access Member
Joined
Jul 20, 2020
Posts
2,271
Reaction score
2,764
Yep, Mine went from Arlington to Chicago in 5 days and will be loaded on carrier to Indianapolis on Monday. I have a weeks work of Upfitting after PDI... Should have by July 1!
 

xcavs31x

Member
Joined
Feb 25, 2025
Posts
50
Reaction score
11
Yep, Mine went from Arlington to Chicago in 5 days and will be loaded on carrier to Indianapolis on Monday. I have a weeks work of Upfitting after PDI... Should have by July 1!
I’m in Arizona and the rail yard is close to the dealership, so I’m hoping it moves quick. I have a road trip starting July 7th so I’m hoping it’s here on time for me to ppf it
 

OKZ71

Member
Joined
Feb 15, 2025
Posts
57
Reaction score
25
I’m in Arizona and the rail yard is close to the dealership, so I’m hoping it moves quick. I have a road trip starting July 7th so I’m hoping it’s here on time for me to ppf it
My TPW was 6/2 . Not sure when it was built, however my dealer said it is currently in Laredo, TX. I am in OKC.

Hopefully the train doesn't head to Arizona before coming up to OKC!
 

xcavs31x

Member
Joined
Feb 25, 2025
Posts
50
Reaction score
11
My TPW was 6/2 . Not sure when it was built, however my dealer said it is currently in Laredo, TX. I am in OKC.

Hopefully the train doesn't head to Arizona before coming up to OKC!
Mine looks like it was built near Arlington TX. Hoping it comes across quick
 

BGNuke

TYF Newbie
Joined
Apr 30, 2025
Posts
17
Reaction score
2
Found out yesterday that my car has made it to the rail yard in Phoenix and should be at the dealer ready to pick up within the next day or two! Looks like it was maybe offloaded from the railcar yesterday during the day. Will post an update here when we take delivery.

Current status code is 4B00 (Bayed).
 

OKZ71

Member
Joined
Feb 15, 2025
Posts
57
Reaction score
25
Found out Friday my truck was not in Laredo, TX as I was told.

It was actually at the dealership...weird...anyways, picked it up today!

tempImage8fR1Qy.jpg

tempImagemsJtxy.jpg

tempImageC03ZLA.jpg
 

dc968

Member
Joined
Nov 18, 2011
Posts
58
Reaction score
29
My Duramax HC has the square exhaust outlets. Sounds the same as my ‘23 which only had one exhaust outlet.
 

Jayhawkeye3

Member
Joined
Jan 26, 2025
Posts
87
Reaction score
30
Are people having issues with the 25 6.2L V8, or was that limited to prior years? If so, I’m going the diesel route, but I haven’t found any news to confirm 25 models are impacted with the engine issues.

TIA!
 

BGNuke

TYF Newbie
Joined
Apr 30, 2025
Posts
17
Reaction score
2
I took delivery of my 2025 Yukon XL AT4 with 3.0L Duramax today. It’s fantastic!

Here’s my full timeline of order dates, status code changes, etc.

4/4 - Order submitted to dealer

4/24 - 2000 or 3000 - Order accepted

5/2 - 3000 - Order accepted

5/9 - 3100 - Order available to sequence

5/16 - 3400 - Order broadcast for production (loaded on assembly plant computers)

Target Production Week: May 26, 2025

5/31 - (3800) - GMC website says “Your vehicle has been produced.”

6/9 - 4200 - Order shipped (notified by dealer)

6/16 - 4B00 - Order at rail yard

6/18 - Vehicle at dealership waiting for PDI

6/20 - Vehicle purchased

IMG_9827.jpeg
 

Attachments

  • IMG_9834.jpeg
    IMG_9834.jpeg
    268.5 KB · Views: 37

OKZ71

Member
Joined
Feb 15, 2025
Posts
57
Reaction score
25
Seeing your timeline confirms I may have gotten really lucky.... Had originally placed this order with a dealership in March and they just never received allocation.

***Called 7 dealers on May 6th looking for anyone with allocation for Z71 Suburban w/ 3.0 Duramax***


1 Dealer said they had the option to swap a 5.3 V8 order out for the 3.0 Duramax


May 6th, 2025 - 1100 - Preliminary order Accepted @ 1:51pm

May 6th, 2025 - 2000 - Accepted by GM @ 1:54 pm

May 6th, 2025 - 3000 - Accepted by Production Control @ 9:37 PM


May 20th, 2025 - TPW of June 2nd, 2025 (told by dealer)


June 4th, 2025 - 3400 - Order Broadcast for production (told by dealer)

June 11th, 2025 - 3800 - 4200 status - (told by dealer) Order Shipped - Currently in Laredo, TX (wrong, it was on their lot)

June 12th, 2025 - Vehicle is at dealership waiting for PDI

June 17th, 2025 - Vehicle Purchased



tempImage89ZLhj.jpg
tempImageaSZnhh.jpg
 
Last edited:

bikit17

TYF Newbie
Joined
Nov 18, 2023
Posts
1
Reaction score
2
Long time lurker, first time poster.
Finally took delivery of our XL Denali ultimate today. Timeline is below:

2/17 - order placed with dealer
5/28 - order accepted by GM. TPW ended up being the week of 7 July
6/25 - notified by dealer that Yukon was built
7/18 - took delivery (Florida)

3.0L, Titanium Rush Metallic
 

Attachments

  • IMG_3979.jpeg
    IMG_3979.jpeg
    440.3 KB · Views: 34
  • IMG_3980.jpeg
    IMG_3980.jpeg
    476 KB · Views: 33

Forum statistics

Threads
138,037
Posts
1,997,594
Members
102,974
Latest member
kikeap
Back
Top