Search results

  1. pwtr02ss

    Pwtr02ss home build

    Thats what I'm doing, I just dont want anyone to run them over:shrug:
  2. pwtr02ss

    Pwtr02ss home build

    Electrical conduit has commenced. They were at 600' when I left this afternoon. Should have the remaining laid and hopefully pass inspection tomorrow. They also started a little more cut on the back. He started hitting rock so I don't think we'll have much more, sadly. I've made...
  3. pwtr02ss

    Yeti's Very Long and Slow NC Home Build

    Quick answer would be 2nd level.
  4. pwtr02ss

    Yeti's Very Long and Slow NC Home Build

    I'm talking about septic location. Just be 100% sure you won't be moving it. Not a huge deal to get another, just a waste of money and time. I'm just messing with you about the vacation thing. You guys will have a beautiful spot for sure tho!
  5. pwtr02ss

    Pwtr02ss home build

    Nothing major to report. Electrical conduit came in today and they have my temp power pole built. They're going to start digging and laying that tomorrow. A little more grade work has been done, basically just sloping off the sharp cut along the crest. We went out there yesterday but I failed to...
  6. pwtr02ss

    Yeti's Very Long and Slow NC Home Build

    Ask it to draw a 6 bay, 40x80 shop with 10x10 doors, 12' wall height, 6/12 pitch on the roof with white board and batten siding and a black, standing seam roof. Curious what it spits out. I'm too poor to pay for ai :( Be aware that septic permits, at least mine, can not be modified. Just...
  7. pwtr02ss

    Yeti's Very Long and Slow NC Home Build

    Looking good broham! That lot is really nice and will require minimal work. Fixed dock is the right call, imo. Refreshing the place helped a ton. What ai are you using? I've not messed with anything except grok and its image generation is terrible. Looks great, just doesn't follow commands...
  8. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Lmao
  9. pwtr02ss

    1992 short bed slow build up

    Coming along nicely!
  10. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Only if you do that sexy pose with the crocs.
  11. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Fence looks great. I have heard horror stories about bamboo. Not sure if there are different versions or whatever, but it takes over.
  12. pwtr02ss

    Pwtr02ss home build

    Little update. Over the past two weeks, more progress has been made. The last two structures and pipe have been installed, underground electric has been marked by the power company, 1,000' of conduit along with a temporary power pole have been ordered, a second septic permit has been paid...
  13. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Priceless
  14. pwtr02ss

    2004 6.0 NV4500 Tahoe

    I'll have debt when they start building. I'm just doing all the site work out of pocket, trying to be as frugal as possible, while having a commercial style site. I've gone a little excessive in storm drain and grading, but I want it to work well. I'm taking donations...:flowers2:
  15. pwtr02ss

    2004 6.0 NV4500 Tahoe

    I haven't borrowed any money yet so I could...:hmm: Not sure the wife would enjoy sleeping in a tent tho
  16. pwtr02ss

    2004 6.0 NV4500 Tahoe

    I had a Camaro that had moisture in the dryer. It worked fine until the media froze. It blew shit everywhere under the hood. I didn't realize that was a replacement item if you left the system exposed for an extended period of time. I'd def swap the orifice tube just for good measure
  17. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Depends on how fast I can get the new place paid for. I'm ready today! Hope you get er fixed up.
  18. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Thanks man. This is a family owned business, just not my family. They told me I've always done what's best for the company so handle it. It's never been easy and sometimes I feel like going to a less stressful job, but it'd be hard to walk away. 7/20 will be my 18th anniversary. Hope you get...
  19. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Hired in. Started in the concrete plant, on the floor. Moved up to batch plant operator, then QC, then estimator/sales. When I started working here, we had 7 guys in the plant. We now employ over 80.
  20. pwtr02ss

    2004 6.0 NV4500 Tahoe

    I actually manage a precast concrete company, so I don't install the items, just design/make/sell them. We make ALOT of manholes so you weren't far off with the dirty holes....
  21. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Yeah, I'm handling the site work, since thats what I do for moneys, didn't see the point in paying someone. We're nearing completion of that. That sucks on the ac compressor. Terrible design.
  22. pwtr02ss

    2004 6.0 NV4500 Tahoe

    Awesome! Yeah, trying to anyway. Will be much cooler when it's finished. At the very least, when its in my builders hands and not my responsibility.
  23. pwtr02ss

    2004 6.0 NV4500 Tahoe

    hey sl-ut. Glad to see you back and glad the truck is doing well! How's life been treating you?
  24. pwtr02ss

    Pwtr02ss home build

    Our builder seems pretty picky so I think he'll cover all of that.

Forum statistics

Threads
138,037
Posts
1,997,588
Members
102,974
Latest member
kikeap
Back
Top