GM ACCEPTED ORDER?!

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

stacy1024

TYF Newbie
Joined
Jan 25, 2022
Posts
18
Reaction score
4
On Jan 22, I ordered a 2022 Z71 Summit White, Luxury Package with pano sunroof. Was told could be a month until GM picked up the order, then saw that both Z71 and panoramic sunroof's have been on the constraint list for the last two weeks. Just checked my status via the chevy web chat and got "Your vehicle order has been accepted by General Motors and is moving toward the production process." When I've checked prior to today it would say "Your order has been submitted by your dealer but has not officially been accepted by GM at this time."

What does this mean?? My dealer has not said anything to be about it being picked up by GM. Can it be picked up and then have no TPW?
 

altona

Full Access Member
Joined
Jan 13, 2022
Posts
159
Reaction score
85
Location
Parrish FL
If you know what week it was accepted Check out the weekly constraint lists on this site. The top of each report will have a TPW near the top. Most likely that will be your week. Generally from acceptance to TPW is 3 weeks
 

Banks22

Full Access Member
Joined
Apr 28, 2021
Posts
840
Reaction score
516
Location
Michigan
On Jan 22, I ordered a 2022 Z71 Summit White, Luxury Package with pano sunroof. Was told could be a month until GM picked up the order, then saw that both Z71 and panoramic sunroof's have been on the constraint list for the last two weeks. Just checked my status via the chevy web chat and got "Your vehicle order has been accepted by General Motors and is moving toward the production process." When I've checked prior to today it would say "Your order has been submitted by your dealer but has not officially been accepted by GM at this time."

What does this mean?? My dealer has not said anything to be about it being picked up by GM. Can it be picked up and then have no TPW?
Went from code 1100 to 2000 Accepted by GM. Means they have the parts necessary for your order and your just waiting on the TPW now. That’s what I got today on my new Silverado was 2000 code.
 
OP
OP
S

stacy1024

TYF Newbie
Joined
Jan 25, 2022
Posts
18
Reaction score
4
If you know what week it was accepted Check out the weekly constraint lists on this site. The top of each report will have a TPW near the top. Most likely that will be your week. Generally from acceptance to TPW is 3 weeks
Yea my dealer said it was just accepted today so I will look!
What is the normal timeframe from production week to delivery?
 
OP
OP
S

stacy1024

TYF Newbie
Joined
Jan 25, 2022
Posts
18
Reaction score
4
Went from code 1100 to 2000 Accepted by GM. Means they have the parts necessary for your order and your just waiting on the TPW now. That’s what I got today on my new Silverado was 2000 code.
Where do you see your code?
 

altona

Full Access Member
Joined
Jan 13, 2022
Posts
159
Reaction score
85
Location
Parrish FL
Production to delivery varies a lot. If it is not held at a storage yard for retrofitting of chips and goes to rail yard 3 weeks is average
 

Eusibius2

Full Access Member
Joined
Oct 3, 2021
Posts
212
Reaction score
146
Location
Chicago burbs
I was lucky to get a TPW of 1/24, and since then both GM and my dealer confirmed it was built (I saw the window sticker with my order # on it). However, I still do not have my new Tahoe yet. I've been told "soon", which is close to the 3 week average. I'm in Chicago area.
 

AgentOrange86

TYF Newbie
Joined
Jan 25, 2022
Posts
18
Reaction score
5
Wait. 3 weeks from production to delivery?? Really??
Negative. My dealer called me yesterday and said my Z71 was accepted with a TPW of March 7th. Delivery from that point is can be very random. I've seen people on this forum get theirs a week later and some other posters have stated their Z71 was sitting in a railyard for a month.

My dealer also confirmed they have no control of the delivery schedule and any delays that might arise in the transfer process.
 

altona

Full Access Member
Joined
Jan 13, 2022
Posts
159
Reaction score
85
Location
Parrish FL
If they sit for a month, it is at a holding yard due to missing parts. If it goes to the rail yard you are much better off. Go to palsapp.com to see where it was trucked to.
 
OP
OP
S

stacy1024

TYF Newbie
Joined
Jan 25, 2022
Posts
18
Reaction score
4
Negative. My dealer called me yesterday and said my Z71 was accepted with a TPW of March 7th. Delivery from that point is can be very random. I've seen people on this forum get theirs a week later and some other posters have stated their Z71 was sitting in a railyard for a month.

My dealer also confirmed they have no control of the delivery schedule and any delays that might arise in the transfer process.
Wonder why TPWs are so different when our orders were accepted by GM on the same day. Mine is April 4
 

todayusay

Full Access Member
Joined
Aug 2, 2016
Posts
580
Reaction score
305
as far as the odd but common TPWs - had a Ram 3500 ordered, expected build date was 1/17 (as were quite a few other known trucks - another forum has a listing of almost 1000 users' trucks broken down by order date/estimated build date/actual build date/window sticker/delivered date and a few other points along the way)

several users that had the same build date actually saw progress within a day or two of the initial build date - mine slid almost 2 weeks until i saw any changes

I'd expect GM is similar - probably don't have vehicles slotted for every business day, probably slot them into a batch that corresponds to 2/3 week possible timeframe. Imagine that most of the TPWs issued are a Monday so maybe its just sometime that week
 

Anh L

Member
Joined
Nov 14, 2021
Posts
31
Reaction score
9
Location
Alberta, Canada
Guys, do you know how long between code 3000 and 3300 ? ( my order at 3000 with no TPW), thanks
 

Attachments

  • Capture.JPG
    Capture.JPG
    38.9 KB · Views: 55

Z15

Full Access Member
Joined
May 24, 2009
Posts
250
Reaction score
197
Location
Michigan ,USA
  • 2500, Order preferenced (This means that the Order has been moved to the stage that parts department is now ready to place the orders for the components that will become your car)
  • 3000, Order accepted by production control (This is the response from production to your 2500 status and is when Parts are actually ordered. No further changes can be made to your order once you reach this point.) TPW usually now known.
  • 3100, Order available to sequence (This is more or less an inter-office memo from Parts to Production saying all parts are committed to this build, they are clear to sequence them for the build.)
  • 3300, Order scheduled for production (This is the response to the 3100 status where Production is cleared to sequence and schedule the build).
  • 3400, Order broadcast (This is when the order is actually loaded onto the production line computers and parts are being staged for the build)
  • 3800, Order produced (The vehicle is completed and has rolled off the line. A Vin is now available.)
  • 4000, Available to ship (Vehicle is off the line and available to ship)
  • 4104, Bailment Invoice (Shipping documents generated)
  • 4150, Original Invoice Generated
  • 4200, Shipped (Moved or in process of moving to another location by transport company, see 4300)
  • 4300, Intermediate Delivery (In combination with a 4200 this is saying that the vehicle has been transported to a vendor, upfitter or some other staging area (overflow lot, off-site rail ramp etc)
  • 4B00, Bayed by the shipper (listed anytime a vehicle is sitting parked waiting for next mode of transportation.)
  • 4D00, Bayed for Quality Control Inspection (Unknown Time frame)
  • 4800, Rail Ramp Unload (unloaded from the rail car and parked waiting to be delivered to dealer)
  • 5000, Delivered to the dealer
  • 6000, Delivered to customer

You have better chances of picking winning lottery numbers than to know for sure when your vehicle will ship. When you combine the QC issues with geographical delivery of vehicles (at the lowest possible cost so they need to aggregate deliveries - and they don't not use a first in first out methodology), this can be the most frustrating part of the whole SRE journey. There is no transparency to actual data. There is just generic codes and sometimes the whisper from "someone in the know". Your vehicle may ship quickly, it may not. It will likely take longer the more rural you are and the lower the volume of cars your dealer sells.
 
Last edited:

Banks22

Full Access Member
Joined
Apr 28, 2021
Posts
840
Reaction score
516
Location
Michigan
Yukon SLT
premium package
MTP
removed RSE
Pearl Beige Metallic
Jet Black interior
22" wheels
Probably the 22” wheels holding it up now. What wheels did u want? Cuz on my new truck there’s only 1 option
 

Forum statistics

Threads
137,705
Posts
1,990,079
Members
102,699
Latest member
moto
Back
Top