Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
Thanks for the info...I appreciate it!depends....
biggest factor is acceptance by GM and will be your biggest hurdle (if it's not already been accepted).
GM allows dealers to place orders even though they don't have a current allocation so "initial" orders can linger for a while especially if there is a unique option on the order (diesel would probably delay it more than anything)
Allocation cycles are usually every two weeks...
once accepted you should receive a "TPW" (targeted production week) of when it'll be built. TPWs can range from a week or two up to 4-6wks after it's accepted.
Picking it up at the dealer tomorrow!Hey everyone!!
I ordered an SLT in March.
GMC accepted order April 5th
Order built on April 17th
Order in transit April 27th
Hopefully we will see it mid this month, early June.
It will be delivered to the yard in Benicia, then will be trucked to the dealer we bought it from.
I ordered a 23 Yukon Denali 4WD Duramax in White Frost Tri-Coat, sunroof, black emblems, and radar cruise control:
Ordered 2/21
Accepted 5/17
Got an email that said it was built on 5/19
Chatted with GMC.com CSR after that and they wasn’t sure why I got that email but confirmed by Target Production Week is 5/29
Hoping to have it around the 4th of July!!
I feel so unlucky having to wait 3 months to get it accepted. I’m not really mad, they said 3-5months estimated until delivery when we ordered it in February. July 21 will be 5 months.Similar story. ordered 5/1 Accepted 5/3, email sent 5/19 as well saying it was built.
Crickets since then. I just logged into chat and they gave me the same TPW..5/29. They think the email was an error. Talk about confusing. I'm used to Ford's system, which is fairly accurate. I hope we receive an email with the VIN and shipping estimate at some point after the TPW.
Hopefully we will have ours vehicle around the start of July.
I feel so unlucky having to wait 3 months to get it accepted. I’m not really mad, they said 3-5months estimated until delivery when we ordered it in February. July 21 will be 5 months.
Ive been waiting on my XL Ultimate to be accepted since January. The dealer expected 3 months but now has no clue since they have received 1 Yukon allocation since April 1.GM seems to really be back on track with built/shipping of the SUV's. My 23 Suburban was exactly 2.5 month from me placing order to delivery. Seems even better now.