RGNEWELL
Supporting Vendor
- Joined
- May 4, 2012
- Posts
- 69
- Reaction score
- 9
My fab shop has ordered 12 gauge cooled roll to build the next model, should take a week or week and a half to be ready to ship. Here is a drawing
It have at least 50% more capacity than my previous model or the one offered by Console Vault.
If you look closely, this version has the top panel with door, two side plates, a front plate, rear plate and a strap that connects the front and rear portion.
I may make an economy model with just the top portion and the side plates.
Feedback welcome.
In addition, a similar model will also be available for the Avalanche, with just the side plates.
Thanks,
Bobby Newell
BTW, I have been out of the LD 2011's for about a week or two, but they are being make and should be ready in a week or so also.
It have at least 50% more capacity than my previous model or the one offered by Console Vault.
If you look closely, this version has the top panel with door, two side plates, a front plate, rear plate and a strap that connects the front and rear portion.
I may make an economy model with just the top portion and the side plates.
Feedback welcome.
In addition, a similar model will also be available for the Avalanche, with just the side plates.
Thanks,
Bobby Newell
BTW, I have been out of the LD 2011's for about a week or two, but they are being make and should be ready in a week or so also.